Panton
Panton, Vermont
- Capacity
- 50 MW
- Status
- Under construction
- Fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Viridis Solar
- City
- Panton
- County
- Addison County
- State
- Vermont
- Expected online
- May 2027
- Balancing authority
- ISNE
Panton is a 50 MW solar power plant in Panton, Vermont. Operated by Viridis Solar, it is under construction with an expected online date of May 2027. The facility is located in Addison County, within the ISNE balancing authority.
Loading map…
Nearby solar plants in Vermont
Shaftsbury Solar
Solar · Shaftsbury, Vermont · Planned · exp. 2026
Fair Haven Solar
Solar · Vermont · Under construction · exp. 2027
Coolidge Solar 1, LLC
Solar · Ludlow, Vermont · Operating · COD 2018
GMP Solar/Storage-Milton Hybrid
Solar · Milton, Vermont · Operating · COD 2019
GMP Solar/Storage-Ferrisburgh Hybrid
Solar · Ferrisburgh, Vermont · Operating · COD 2019
Source: U.S. Energy Information Administration (EIA-860M)