GMP Solar/Storage-Ferrisburgh Hybrid
Ferrisburgh, Vermont
- Capacity
- 7 MW
- Status
- Operating
- Fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Green Mountain Power Corp
- City
- Ferrisburgh
- County
- Addison County
- State
- Vermont
- Operational date
- September 2019
- Balancing authority
- ISNE
GMP Solar/Storage-Ferrisburgh Hybrid is a 7 MW solar power plant in Ferrisburgh, Vermont. Operated by Green Mountain Power Corp, it has been operating since 2019. The facility is located in Addison County, within the ISNE balancing authority.
Loading map…
Nearby solar plants in Vermont
Panton
Solar · Panton, Vermont · Under construction · exp. 2027
Shaftsbury Solar
Solar · Shaftsbury, Vermont · Planned · exp. 2026
Fair Haven Solar
Solar · Vermont · Under construction · exp. 2027
Coolidge Solar 1, LLC
Solar · Ludlow, Vermont · Operating · COD 2018
GMP Solar/Storage-Milton Hybrid
Solar · Milton, Vermont · Operating · COD 2019
Source: U.S. Energy Information Administration (EIA-860M)