Carolina Lily Solar
Advance, North Carolina
- Capacity
- 5 MW
- Status
- Operating
- Fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Carolina Lily Solar, LLC
- City
- Advance
- County
- Davie County
- State
- North Carolina
- Operational date
- May 2021
- Balancing authority
- DUK
Carolina Lily Solar is a 5 MW solar power plant in Advance, North Carolina. Operated by Carolina Lily Solar, LLC, it has been operating since 2021. The facility is located in Davie County, within the DUK balancing authority.
Loading map…
Nearby solar plants in North Carolina
American Beech Solar LLC
Solar · Scotland Neck, North Carolina · Operating · COD 2025
Albemarle Beach Solar
Solar · Roper, North Carolina · Operating · COD 2020
Oak Solar
Solar · Gaston, North Carolina · Operating · COD 2023
Black Walnut Solar, LLC
Solar · Pollocksville, North Carolina · Under construction · exp. 2027
Timber Mill Solar
Solar · Pollocksville, North Carolina · Planned · exp. 2028
Source: U.S. Energy Information Administration (EIA-860M)