Oak Solar
Gaston, North Carolina
- Capacity
- 120 MW
- Status
- Operating
- Fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Oak Solar LLC
- City
- Gaston
- County
- Northampton County
- State
- North Carolina
- Operational date
- December 2023
- Balancing authority
- PJM
Oak Solar is a 120 MW solar power plant in Gaston, North Carolina. Operated by Oak Solar LLC, it has been operating since 2023. The facility is located in Northampton County, within the PJM balancing authority.
Loading map…
Nearby solar plants in North Carolina
American Beech Solar LLC
Solar · Scotland Neck, North Carolina · Operating · COD 2025
Albemarle Beach Solar
Solar · Roper, North Carolina · Operating · COD 2020
Black Walnut Solar, LLC
Solar · Pollocksville, North Carolina · Under construction · exp. 2027
Timber Mill Solar
Solar · Pollocksville, North Carolina · Planned · exp. 2028
Panther Branch Solar, LLC
Solar · Faison, North Carolina · Under construction · exp. 2028
Source: U.S. Energy Information Administration (EIA-860M)