Gaston Solar Power Plant
Cherryville Township, North Carolina
- Capacity
- 25 MW
- Status
- Operating
- Fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Duke Energy Carolinas, LLC
- City
- Cherryville Township
- County
- Gaston County
- State
- North Carolina
- Operational date
- December 2020
- Balancing authority
- DUK
Gaston Solar Power Plant is a 25 MW solar power plant in Cherryville Township, North Carolina. Operated by Duke Energy Carolinas, LLC, it has been operating since 2020. The facility is located in Gaston County, within the DUK balancing authority.
Loading map…
Nearby solar plants in North Carolina
American Beech Solar LLC
Solar · Scotland Neck, North Carolina · Operating
Albemarle Beach Solar
Solar · Roper, North Carolina · Operating
Oak Solar
Solar · Gaston, North Carolina · Operating
Black Walnut Solar, LLC
Solar · Pollocksville, North Carolina · Under construction
Timber Mill Solar
Solar · Pollocksville, North Carolina · Planned
Source: U.S. Energy Information Administration (EIA-860M)