Jumper Creek Solar Plant
Florida
- Capacity
- 74.9 MW
- Status
- Operating
- Fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Duke Energy Florida, LLC
- County
- Sumter County
- State
- Florida
- Operational date
- April 2026
- Balancing authority
- FPC
Jumper Creek Solar Plant is a 74.9 MW solar power plant in Florida. Operated by Duke Energy Florida, LLC, it has been operating since 2026. The facility is located in Sumter County, within the FPC balancing authority.
Loading map…
Nearby solar plants in Florida
Tenmile Creek
Solar · TBD, Florida · Operating · COD 2025
Blackwater River Solar Energy Center
Solar · Milton, Florida · Operating · COD 2023
FPL Shirer Branch Solar Energy Center
Solar · Clarksville, Florida · Operating · COD 2023
FPL Chipola River Solar Energy Center
Solar · Altha, Florida · Operating · COD 2023
Canoe
Solar · Holt, Florida · Operating · COD 2024
Source: U.S. Energy Information Administration (EIA-860M)