Blackwater River Solar Energy Center
Milton, Florida
- Capacity
- 149 MW
- Status
- Operating
- Fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Florida Power & Light Co
- City
- Milton
- County
- Santa Rosa County
- State
- Florida
- Operational date
- January 2023
- Balancing authority
- FPL
Blackwater River Solar Energy Center is a 149 MW solar power plant in Milton, Florida. Operated by Florida Power & Light Co, it has been operating since 2023. The facility is located in Santa Rosa County, within the FPL balancing authority.
Loading map…
Nearby solar plants in Florida
Tenmile Creek
Solar · TBD, Florida · Operating · COD 2025
FPL Shirer Branch Solar Energy Center
Solar · Clarksville, Florida · Operating · COD 2023
FPL Chipola River Solar Energy Center
Solar · Altha, Florida · Operating · COD 2023
Canoe
Solar · Holt, Florida · Operating · COD 2024
Kayak
Solar · TBD, Florida · Operating · COD 2024
Source: U.S. Energy Information Administration (EIA-860M)