Brewster Solar
Florida
- Capacity
- 42.7 MW
- Status
- Under construction
- Fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Tampa Electric Co
- County
- Polk County
- State
- Florida
- Expected online
- December 2026
- Balancing authority
- TEC
Brewster Solar is a 42.7 MW solar power plant in Florida. Operated by Tampa Electric Co, it is under construction with an expected online date of December 2026. The facility is located in Polk County, within the TEC balancing authority.
Loading map…
Nearby solar plants in Florida
Tenmile Creek
Solar · TBD, Florida · Operating
Blackwater River Solar Energy Center
Solar · Milton, Florida · Operating
FPL Shirer Branch Solar Energy Center
Solar · Clarksville, Florida · Operating
FPL Chipola River Solar Energy Center
Solar · Altha, Florida · Operating
Canoe
Solar · Holt, Florida · Operating
Source: U.S. Energy Information Administration (EIA-860M)