Harmony Florida Solar II
Kissimmee, Florida
- Capacity
- 74.5 MW
- Status
- Operating
- Fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Harmony Florida Solar II, LLC
- City
- Kissimmee
- County
- Osceola County
- State
- Florida
- Operational date
- December 2024
- Balancing authority
- FPC
Harmony Florida Solar II is a 74.5 MW solar power plant in Kissimmee, Florida. Operated by Harmony Florida Solar II, LLC, it has been operating since 2024. The facility is located in Osceola County, within the FPC balancing authority.
Loading map…
Nearby solar plants in Florida
Tenmile Creek
Solar · TBD, Florida · Operating · COD 2025
Blackwater River Solar Energy Center
Solar · Milton, Florida · Operating · COD 2023
FPL Shirer Branch Solar Energy Center
Solar · Clarksville, Florida · Operating · COD 2023
FPL Chipola River Solar Energy Center
Solar · Altha, Florida · Operating · COD 2023
Canoe
Solar · Holt, Florida · Operating · COD 2024
Source: U.S. Energy Information Administration (EIA-860M)