Tide Bay
Fort Meade, Florida
- Capacity
- 74.9 MW
- Status
- Under construction
- Fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Origis Energy USA, Inc
- City
- Fort Meade
- County
- Polk County
- State
- Florida
- Expected online
- December 2026
- Balancing authority
- FPC
Tide Bay is a 74.9 MW solar power plant in Fort Meade, Florida. Operated by Origis Energy USA, Inc, it is under construction with an expected online date of December 2026. The facility is located in Polk County, within the FPC balancing authority.
Loading map…
Nearby solar plants in Florida
Tenmile Creek
Solar · TBD, Florida · Operating · COD 2025
Blackwater River Solar Energy Center
Solar · Milton, Florida · Operating · COD 2023
FPL Shirer Branch Solar Energy Center
Solar · Clarksville, Florida · Operating · COD 2023
FPL Chipola River Solar Energy Center
Solar · Altha, Florida · Operating · COD 2023
Canoe
Solar · Holt, Florida · Operating · COD 2024
Source: U.S. Energy Information Administration (EIA-860M)