Hardeetown Solar Power Plant
Chiefland, Florida
- Capacity
- 74.9 MW
- Status
- Operating
- Fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Duke Energy Florida, LLC
- City
- Chiefland
- County
- Levy County
- State
- Florida
- Operational date
- April 2023
- Balancing authority
- FPC
Hardeetown Solar Power Plant is a 74.9 MW solar power plant in Chiefland, Florida. Operated by Duke Energy Florida, LLC, it has been operating since 2023. The facility is located in Levy County, within the FPC balancing authority.
Loading map…
Nearby solar plants in Florida
Tenmile Creek
Solar · TBD, Florida · Operating · COD 2025
Blackwater River Solar Energy Center
Solar · Milton, Florida · Operating · COD 2023
FPL Shirer Branch Solar Energy Center
Solar · Clarksville, Florida · Operating · COD 2023
FPL Chipola River Solar Energy Center
Solar · Altha, Florida · Operating · COD 2023
Canoe
Solar · Holt, Florida · Operating · COD 2024
Source: U.S. Energy Information Administration (EIA-860M)