Highland Solar South
Lake Placid, Florida
- Capacity
- 74.9 MW
- Status
- Under construction
- Fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Placid Solar, LLC
- City
- Lake Placid
- County
- Highlands County
- State
- Florida
- Expected online
- June 2026
- Balancing authority
- FPC
Highland Solar South is a 74.9 MW solar power plant in Lake Placid, Florida. Operated by Placid Solar, LLC, it is under construction with an expected online date of June 2026. The facility is located in Highlands County, within the FPC balancing authority.
Loading map…
Nearby solar plants in Florida
Tenmile Creek
Solar · TBD, Florida · Operating
Blackwater River Solar Energy Center
Solar · Milton, Florida · Operating
FPL Shirer Branch Solar Energy Center
Solar · Clarksville, Florida · Operating
FPL Chipola River Solar Energy Center
Solar · Altha, Florida · Operating
Canoe
Solar · Holt, Florida · Operating
Source: U.S. Energy Information Administration (EIA-860M)