Citrus Ridge Solar
Bay Lake, Florida
- Capacity
- 52 MW
- Status
- Operating
- Fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- FL Solar 5, LLC
- City
- Bay Lake
- County
- Orange County
- State
- Florida
- Operational date
- December 2018
- Balancing authority
- FPC
Citrus Ridge Solar is a 52 MW solar power plant in Bay Lake, Florida. Operated by FL Solar 5, LLC, it has been operating since 2018. The facility is located in Orange County, within the FPC balancing authority.
Loading map…
Nearby solar plants in Florida
Tenmile Creek
Solar · TBD, Florida · Operating · COD 2025
Blackwater River Solar Energy Center
Solar · Milton, Florida · Operating · COD 2023
FPL Shirer Branch Solar Energy Center
Solar · Clarksville, Florida · Operating · COD 2023
FPL Chipola River Solar Energy Center
Solar · Altha, Florida · Operating · COD 2023
Canoe
Solar · Holt, Florida · Operating · COD 2024
Source: U.S. Energy Information Administration (EIA-860M)