Bartow Solar Energy LLC
Bartow, Florida
- Capacity
- 7.3 MW
- Status
- Operating
- Fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Cardinal Renewables
- City
- Bartow
- County
- Polk County
- State
- Florida
- Operational date
- March 2018
- Balancing authority
- FPC
Bartow Solar Energy LLC is a 7.3 MW solar power plant in Bartow, Florida. Operated by Cardinal Renewables, it has been operating since 2018. The facility is located in Polk County, within the FPC balancing authority.
Loading map…
Nearby solar plants in Florida
Tenmile Creek
Solar · TBD, Florida · Operating · COD 2025
Blackwater River Solar Energy Center
Solar · Milton, Florida · Operating · COD 2023
FPL Shirer Branch Solar Energy Center
Solar · Clarksville, Florida · Operating · COD 2023
FPL Chipola River Solar Energy Center
Solar · Altha, Florida · Operating · COD 2023
Canoe
Solar · Holt, Florida · Operating · COD 2024
Source: U.S. Energy Information Administration (EIA-860M)