Payne Creek Solar
Bowling Green, Florida
- Capacity
- 70.3 MW
- Status
- Operating
- Fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Tampa Electric Co
- City
- Bowling Green
- County
- Polk County
- State
- Florida
- Operational date
- September 2018
- Balancing authority
- TEC
Payne Creek Solar is a 70.3 MW solar power plant in Bowling Green, Florida. Operated by Tampa Electric Co, it has been operating since 2018. The facility is located in Polk County, within the TEC balancing authority.
Loading map…
Nearby solar plants in Florida
Tenmile Creek
Solar · TBD, Florida · Operating · COD 2025
Blackwater River Solar Energy Center
Solar · Milton, Florida · Operating · COD 2023
FPL Shirer Branch Solar Energy Center
Solar · Clarksville, Florida · Operating · COD 2023
FPL Chipola River Solar Energy Center
Solar · Altha, Florida · Operating · COD 2023
Canoe
Solar · Holt, Florida · Operating · COD 2024
Source: U.S. Energy Information Administration (EIA-860M)