Bonnie Mine Solar
Bartow, Florida
- Capacity
- 37.5 MW
- Status
- Operating
- Fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Tampa Electric Co
- City
- Bartow
- County
- Polk County
- State
- Florida
- Operational date
- January 2019
- Balancing authority
- TEC
Bonnie Mine Solar is a 37.5 MW solar power plant in Bartow, Florida. Operated by Tampa Electric Co, it has been operating since 2019. The facility is located in Polk County, within the TEC balancing authority.
Loading map…
Nearby solar plants in Florida
Tenmile Creek
Solar · TBD, Florida · Operating · COD 2025
Blackwater River Solar Energy Center
Solar · Milton, Florida · Operating · COD 2023
FPL Shirer Branch Solar Energy Center
Solar · Clarksville, Florida · Operating · COD 2023
FPL Chipola River Solar Energy Center
Solar · Altha, Florida · Operating · COD 2023
Canoe
Solar · Holt, Florida · Operating · COD 2024
Source: U.S. Energy Information Administration (EIA-860M)