Gulf Coast Solar Center II
Navarre, Florida
- Capacity
- 40 MW
- Status
- Operating
- Fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Arevon Energy, Inc.
- City
- Navarre
- County
- Santa Rosa County
- State
- Florida
- Operational date
- November 2017
- Balancing authority
- SOCO
Gulf Coast Solar Center II is a 40 MW solar power plant in Navarre, Florida. Operated by Arevon Energy, Inc., it has been operating since 2017. The facility is located in Santa Rosa County, within the SOCO balancing authority.
Loading map…
Nearby solar plants in Florida
Tenmile Creek
Solar · TBD, Florida · Operating · COD 2025
Blackwater River Solar Energy Center
Solar · Milton, Florida · Operating · COD 2023
FPL Shirer Branch Solar Energy Center
Solar · Clarksville, Florida · Operating · COD 2023
FPL Chipola River Solar Energy Center
Solar · Altha, Florida · Operating · COD 2023
Canoe
Solar · Holt, Florida · Operating · COD 2024
Source: U.S. Energy Information Administration (EIA-860M)