Shamrock Wind
TBD, Texas
- Capacity
- 324 MW
- Status
- Operating
- Fuel
- Wind
- Technology
- Onshore Wind Turbine
- Operator
- Shamrock Wind LLC
- City
- TBD
- County
- Crockett County
- State
- Texas
- Operational date
- December 2023
- Balancing authority
- ERCO
Shamrock Wind is a 324 MW wind power plant in TBD, Texas. Operated by Shamrock Wind LLC, it has been operating since 2023. The facility is located in Crockett County, within the ERCO balancing authority.
Loading map…
Nearby wind plants in Texas
Great Prairie Wind
Wind · Gruver, Texas · Operating · COD 2022
Horse Hollow Wind Energy Center
Wind · Wingate, Texas · Operating · COD 2005
IP Roman Wind
Wind · Hereford, Texas · Under construction · exp. 2028
Capricorn Ridge Wind LLC
Wind · Sterling City, Texas · Operating · COD 2007
High Lonesome Wind Power, LLC Hybrid
Wind · Rankin, Texas · Operating · COD 2023
Source: U.S. Energy Information Administration (EIA-860M)