Wolf Ridge Wind
Muenster, Texas
- Capacity
- 113 MW
- Status
- Operating
- Fuel
- Wind
- Technology
- Onshore Wind Turbine
- Operator
- NextEra Wolf Ridge LLC
- City
- Muenster
- County
- Cooke County
- State
- Texas
- Operational date
- August 2008
- Balancing authority
- ERCO
Wolf Ridge Wind is a 113 MW wind power plant in Muenster, Texas. Operated by NextEra Wolf Ridge LLC, it has been operating since 2008. The facility is located in Cooke County, within the ERCO balancing authority.
Loading map…
Nearby wind plants in Texas
Great Prairie Wind
Wind · Gruver, Texas · Operating · COD 2022
Horse Hollow Wind Energy Center
Wind · Wingate, Texas · Operating · COD 2005
IP Roman Wind
Wind · Hereford, Texas · Under construction · exp. 2028
Capricorn Ridge Wind LLC
Wind · Sterling City, Texas · Operating · COD 2007
High Lonesome Wind Power, LLC Hybrid
Wind · Rankin, Texas · Operating · COD 2023
Source: U.S. Energy Information Administration (EIA-860M)