Callahan Divide Wind Energy Center
Tusocola, Texas
- Capacity
- 114 MW
- Status
- Operating
- Fuel
- Wind
- Technology
- Onshore Wind Turbine
- Operator
- FPL Energy Callahan Wind, LLC
- City
- Tusocola
- County
- Taylor County
- State
- Texas
- Operational date
- March 2005
- Balancing authority
- ERCO
Callahan Divide Wind Energy Center is a 114 MW wind power plant in Tusocola, Texas. Operated by FPL Energy Callahan Wind, LLC, it has been operating since 2005. The facility is located in Taylor County, within the ERCO balancing authority.
Loading map…
Nearby wind plants in Texas
Great Prairie Wind
Wind · Gruver, Texas · Operating · COD 2022
Horse Hollow Wind Energy Center
Wind · Wingate, Texas · Operating · COD 2005
IP Roman Wind
Wind · Hereford, Texas · Under construction · exp. 2028
Capricorn Ridge Wind LLC
Wind · Sterling City, Texas · Operating · COD 2007
High Lonesome Wind Power, LLC Hybrid
Wind · Rankin, Texas · Operating · COD 2023
Source: U.S. Energy Information Administration (EIA-860M)