NaturEner Glacier Wind Energy 2
Ethridge, Montana
- Capacity
- 104 MW
- Status
- Operating
- Fuel
- Wind
- Technology
- Onshore Wind Turbine
- Operator
- NaturEner Glacier Wind Energy 2 LLC
- City
- Ethridge
- County
- Toole County
- State
- Montana
- Operational date
- November 2009
- Balancing authority
- GWA
NaturEner Glacier Wind Energy 2 is a 104 MW wind power plant in Ethridge, Montana. Operated by NaturEner Glacier Wind Energy 2 LLC, it has been operating since 2009. The facility is located in Toole County, within the GWA balancing authority.
Loading map…
Nearby wind plants in Montana
Haymaker Hybrid
Wind · Twodot, Montana · Planned · exp. 2031
Clearwater Wind I
Wind · Miles City, Montana · Operating · COD 2022
Beaver Creek Wind Facility
Wind · Big Timber, Montana · Operating · COD 2025
Pryor Mountain Wind
Wind · Bridger, Montana · Operating · COD 2021
Clearwater Wind East
Wind · Miles City, Montana · Operating · COD 2024
Source: U.S. Energy Information Administration (EIA-860M)