Top Hat Wind
Illinois
- Capacity
- 204 MW
- Status
- Operating
- Fuel
- Wind
- Technology
- Onshore Wind Turbine
- Operator
- Appalachian Power Co
- County
- Logan County
- State
- Illinois
- Operational date
- December 2025
- Balancing authority
- PJM
Top Hat Wind is a 204 MW wind power plant in Illinois. Operated by Appalachian Power Co, it has been operating since 2025. The facility is located in Logan County, within the PJM balancing authority.
Loading map…
Nearby wind plants in Illinois
Illinois Generation LLC
Wind · Illinois · Under construction · exp. 2028
Panther Grove 2
Wind · Illinois · Under construction · exp. 2027
Panther Grove Wind, LLC
Wind · Peoria, Illinois · Under construction · exp. 2026
Lincoln Land Wind
Wind · TBD, Illinois · Operating · COD 2021
Streator Cayuga Ridge South
Wind · Odell, Illinois · Operating · COD 2010
Source: U.S. Energy Information Administration (EIA-860M)