Wolf River (Chipewa 1)
Stanley, Wisconsin
- Capacity
- 1.5 MW
- Status
- Operating
- Fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Greenbacker Renewable Energy Corporation
- City
- Stanley
- County
- Chippewa County
- State
- Wisconsin
- Operational date
- February 2024
- Balancing authority
- MISO
Wolf River (Chipewa 1) is a 1.5 MW solar power plant in Stanley, Wisconsin. Operated by Greenbacker Renewable Energy Corporation, it has been operating since 2024. The facility is located in Chippewa County, within the MISO balancing authority.
Loading map…
Nearby solar plants in Wisconsin
Vista Sands Solar
Solar · Plover, Wisconsin · Under construction · exp. 2028
Paris Solar
Solar · Union Grove, Wisconsin · Operating · COD 2024
Koshkonong Solar Energy Center LLC
Solar · Wisconsin · Under construction · exp. 2026
High Noon Solar Energy LLC
Solar · Wisconsin · Under construction · exp. 2027
Grant County
Solar · Town of Potosi, Wisconsin · Operating · COD 2024
Source: U.S. Energy Information Administration (EIA-860M)