The Village at Orchard Ridge (TVOR)
Winchester, Virginia
- Capacity
- 1.4 MW
- Status
- Operating
- Fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Distributed Solar Development, LLC
- City
- Winchester
- County
- Frederick County
- State
- Virginia
- Operational date
- March 2023
- Balancing authority
- PJM
The Village at Orchard Ridge (TVOR) is a 1.4 MW solar power plant in Winchester, Virginia. Operated by Distributed Solar Development, LLC, it has been operating since 2023. The facility is located in Frederick County, within the PJM balancing authority.
Loading map…
Nearby solar plants in Virginia
Bellflower Solar (VA)
Solar · TBD, Virginia · Planned · exp. 2030
Rocky Run Solar
Solar · TBD, Virginia · Planned · exp. 2028
Pleinmont Solar 2
Solar · Spotsylvania, Virginia · Operating · COD 2021
Sycamore Cross Solar
Solar · Smithfield, Virginia · Planned · exp. 2027
Axton Solar
Solar · Axton, Virginia · Under construction · exp. 2028
Source: U.S. Energy Information Administration (EIA-860M)