Elektron Solar, LLC
Grantsville, Utah
- Capacity
- 80 MW
- Status
- Operating
- Fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Elektron Solar, LLC
- City
- Grantsville
- County
- Tooele County
- State
- Utah
- Operational date
- May 2024
- Balancing authority
- PACE
Elektron Solar, LLC is a 80 MW solar power plant in Grantsville, Utah. Operated by Elektron Solar, LLC, it has been operating since 2024. The facility is located in Tooele County, within the PACE balancing authority.
Loading map…
Nearby solar plants in Utah
Source: U.S. Energy Information Administration (EIA-860M)