Three Peaks Power
Cedar City, Utah
- Capacity
- 80 MW
- Status
- Operating
- Fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Onward Energy
- City
- Cedar City
- County
- Iron County
- State
- Utah
- Operational date
- December 2016
- Balancing authority
- PACE
Three Peaks Power is a 80 MW solar power plant in Cedar City, Utah. Operated by Onward Energy, it has been operating since 2016. The facility is located in Iron County, within the PACE balancing authority.
Loading map…
Nearby solar plants in Utah
Source: U.S. Energy Information Administration (EIA-860M)