Arrow Canyon Solar Hybrid
Moapa, Nevada
- Capacity
- 275 MW
- Status
- Operating
- Fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Arrow Canyon Solar LLC
- City
- Moapa
- County
- Clark County
- State
- Nevada
- Operational date
- December 2023
- Balancing authority
- NEVP
Arrow Canyon Solar Hybrid is a 275 MW solar power plant in Moapa, Nevada. Operated by Arrow Canyon Solar LLC, it has been operating since 2023. The facility is located in Clark County, within the NEVP balancing authority.