Townsite Solar Project Hybrid
Boulder City, Nevada
- Capacity
- 270 MW
- Status
- Operating
- Fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Townsite Solar, LLC
- City
- Boulder City
- County
- Clark County
- State
- Nevada
- Operational date
- December 2021
- Balancing authority
- WALC
Townsite Solar Project Hybrid is a 270 MW solar power plant in Boulder City, Nevada. Operated by Townsite Solar, LLC, it has been operating since 2021. The facility is located in Clark County, within the WALC balancing authority.
Loading map…
Nearby solar plants in Nevada
Gemini Solar Hybrid
Solar · Unincorporated, Nevada · Operating · COD 2024
Sierra Solar Hybrid
Solar · Fernley, Nevada · Under construction · exp. 2027
Arida Solar (Hybrid)
Solar · Laughlin, Nevada · Planned · exp. 2029
Bonanza Solar and Storage Project
Solar · Unincorporated Clark, Nevada · Under construction · exp. 2027
Rough Hat
Solar · Pahrump, Nevada · Under construction · exp. 2027
Source: U.S. Energy Information Administration (EIA-860M)