Stillwater Facility
Fallon, Nevada
- Capacity
- 90.2 MW
- Status
- Operating
- Fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Ormat Stillwater LLC
- City
- Fallon
- County
- Churchill County
- State
- Nevada
- Operational date
- March 2009
- Balancing authority
- NEVP
Stillwater Facility is a 90.2 MW solar power plant in Fallon, Nevada. Operated by Ormat Stillwater LLC, it has been operating since 2009. The facility is located in Churchill County, within the NEVP balancing authority.
Loading map…
Nearby solar plants in Nevada
Gemini Solar Hybrid
Solar · Unincorporated, Nevada · Operating · COD 2024
Sierra Solar Hybrid
Solar · Fernley, Nevada · Under construction · exp. 2027
Arida Solar (Hybrid)
Solar · Laughlin, Nevada · Planned · exp. 2029
Bonanza Solar and Storage Project
Solar · Unincorporated Clark, Nevada · Under construction · exp. 2027
Rough Hat
Solar · Pahrump, Nevada · Under construction · exp. 2027
Source: U.S. Energy Information Administration (EIA-860M)