SR Panola II, LLC
Batesville, Mississippi
- Capacity
- 4.8 MW
- Status
- Operating
- Fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- SR Panola II, LLC
- City
- Batesville
- County
- Panola County
- State
- Mississippi
- Operational date
- July 2024
- Balancing authority
- TVA
SR Panola II, LLC is a 4.8 MW solar power plant in Batesville, Mississippi. Operated by SR Panola II, LLC, it has been operating since 2024. The facility is located in Panola County, within the TVA balancing authority.
Loading map…
Nearby solar plants in Mississippi
Golden Triangle
Solar · Lowndes, Mississippi · Operating · COD 2025
Optimist
Solar · West Point, Mississippi · Operating · COD 2026
Greer Solar Plant
Solar · Hollandale, Mississippi · Under construction · exp. 2026
Golden Triangle II
Solar · St.Artesia, Mississippi · Operating · COD 2024
Penton Solar Plant
Solar · Lake Cormorant, Mississippi · Planned · exp. 2028
Source: U.S. Energy Information Administration (EIA-860M)