Sunflower County
Ruleville, Mississippi
- Capacity
- 100 MW
- Status
- Operating
- Fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Sunflower County Solar Project, LLC
- City
- Ruleville
- County
- Sunflower County
- State
- Mississippi
- Operational date
- September 2022
- Balancing authority
- MISO
Sunflower County is a 100 MW solar power plant in Ruleville, Mississippi. Operated by Sunflower County Solar Project, LLC, it has been operating since 2022. The facility is located in Sunflower County, within the MISO balancing authority.
Loading map…
Nearby solar plants in Mississippi
Golden Triangle
Solar · Lowndes, Mississippi · Operating · COD 2025
Optimist
Solar · West Point, Mississippi · Operating · COD 2026
Greer Solar Plant
Solar · Hollandale, Mississippi · Under construction · exp. 2026
Golden Triangle II
Solar · St.Artesia, Mississippi · Operating · COD 2024
Penton Solar Plant
Solar · Lake Cormorant, Mississippi · Planned · exp. 2028
Source: U.S. Energy Information Administration (EIA-860M)