Meridian III
Meridian, Mississippi
- Capacity
- 52.5 MW
- Status
- Operating
- Fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- SR Meridian III, LLC
- City
- Meridian
- County
- Lauderdale County
- State
- Mississippi
- Operational date
- December 2019
- Balancing authority
- SOCO
Meridian III is a 52.5 MW solar power plant in Meridian, Mississippi. Operated by SR Meridian III, LLC, it has been operating since 2019. The facility is located in Lauderdale County, within the SOCO balancing authority.
Loading map…
Nearby solar plants in Mississippi
Golden Triangle
Solar · Lowndes, Mississippi · Operating · COD 2025
Optimist
Solar · West Point, Mississippi · Operating · COD 2026
Greer Solar Plant
Solar · Hollandale, Mississippi · Under construction · exp. 2026
Golden Triangle II
Solar · St.Artesia, Mississippi · Operating · COD 2024
Penton Solar Plant
Solar · Lake Cormorant, Mississippi · Planned · exp. 2028
Source: U.S. Energy Information Administration (EIA-860M)