Peoria Solar 3
Dunlap, Illinois
- Capacity
- 4.9 MW
- Status
- Operating
- Fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Pivot Energy
- City
- Dunlap
- County
- Peoria County
- State
- Illinois
- Operational date
- December 2025
- Balancing authority
- MISO
Peoria Solar 3 is a 4.9 MW solar power plant in Dunlap, Illinois. Operated by Pivot Energy, it has been operating since 2025. The facility is located in Peoria County, within the MISO balancing authority.
Loading map…
Nearby solar plants in Illinois
Steward Creek Solar Phase 1
Solar · Steward, Illinois · Planned · exp. 2029
Double Back Diamond
Solar · Virden, Illinois · Operating · COD 2024
Pulaski Solar
Solar · Grand Chain, Illinois · Under construction · exp. 2026
Heritage Prairie Solar LLC
Solar · Illinois · Under construction · exp. 2028
Archtop Solar
Solar · Illinois · Under construction · exp. 2026
Source: U.S. Energy Information Administration (EIA-860M)