SR Metter
Aline, Georgia
- Capacity
- 79.7 MW
- Status
- Under construction
- Fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- SR Metter, LLC
- City
- Aline
- County
- Candler County
- State
- Georgia
- Expected online
- December 2026
- Balancing authority
- TVA
SR Metter is a 79.7 MW solar power plant in Aline, Georgia. Operated by SR Metter, LLC, it is under construction with an expected online date of December 2026. The facility is located in Candler County, within the TVA balancing authority.
Loading map…
Nearby solar plants in Georgia
Pepper Hammock Solar and Storage
Solar · Thalmann, Georgia · Under construction · exp. 2027
Peach Wood Solar
Solar · Georgia · Planned · exp. 2030
Wadley Solar
Solar · Wadley, Georgia · Operating · COD 2025
Robins Air Force Base Solar
Solar · Macon, Georgia · Operating · COD 2021
Cool Springs Solar (Hybrid)
Solar · Bainbridge, Georgia · Operating · COD 2021
Source: U.S. Energy Information Administration (EIA-860M)