SR Arlington II
Blakely, Georgia
- Capacity
- 103 MW
- Status
- Operating
- Fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- SR Arlington II MT, LLC
- City
- Blakely
- County
- Early County
- State
- Georgia
- Operational date
- November 2019
- Balancing authority
- SOCO
SR Arlington II is a 103 MW solar power plant in Blakely, Georgia. Operated by SR Arlington II MT, LLC, it has been operating since 2019. The facility is located in Early County, within the SOCO balancing authority.
Loading map…
Nearby solar plants in Georgia
Pepper Hammock Solar and Storage
Solar · Thalmann, Georgia · Under construction · exp. 2027
Peach Wood Solar
Solar · Georgia · Planned · exp. 2030
Wadley Solar
Solar · Wadley, Georgia · Operating · COD 2025
Robins Air Force Base Solar
Solar · Macon, Georgia · Operating · COD 2021
Cool Springs Solar (Hybrid)
Solar · Bainbridge, Georgia · Operating · COD 2021
Source: U.S. Energy Information Administration (EIA-860M)