CMEEC - Navy NE Trident
Groton, Connecticut
- Capacity
- 1 MW
- Status
- Operating
- Fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Tesla Inc.
- City
- Groton
- County
- New London County
- State
- Connecticut
- Operational date
- June 2017
- Balancing authority
- ISNE
CMEEC - Navy NE Trident is a 1 MW solar power plant in Groton, Connecticut. Operated by Tesla Inc., it has been operating since 2017. The facility is located in New London County, within the ISNE balancing authority.
Loading map…
Nearby solar plants in Connecticut
Broadleaf Solar
Solar · East Granby, Connecticut · Under construction · exp. 2028
Pure Hedge LLC
Solar · Sterling, Connecticut · Under construction · exp. 2027
Gravel Pit Solar, LLC
Solar · East Windsor, Connecticut · Operating · COD 2025
Quinebaug Solar
Solar · Canterbury, Connecticut · Operating · COD 2021
DWW Solar ll
Solar · Simsbury, Connecticut · Operating · COD 2019
Source: U.S. Energy Information Administration (EIA-860M)