LPEA Sunnyside Solar 1 Facility
Durango, Colorado
- Capacity
- 1.7 MW
- Status
- Operating
- Fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- La Plata Electric Assn, Inc
- City
- Durango
- County
- La Plata County
- State
- Colorado
- Operational date
- July 2024
- Balancing authority
- WACM
LPEA Sunnyside Solar 1 Facility is a 1.7 MW solar power plant in Durango, Colorado. Operated by La Plata Electric Assn, Inc, it has been operating since 2024. The facility is located in La Plata County, within the WACM balancing authority.
Loading map…
Nearby solar plants in Colorado
Rocky Mountain Solar
Solar · Colorado · Operating · COD 2025
Neptune Energy Center Hybrid
Solar · Boone, Colorado · Operating · COD 2023
Fortress 1
Solar · Colorado · Under construction · exp. 2028
Thunder Wolf Energy Center Hybrid
Solar · Avondale, Colorado · Operating · COD 2023
Arroyo Solar
Solar · Avondale, Colorado · Under construction · exp. 2026
Source: U.S. Energy Information Administration (EIA-860M)