Oak Leaf - CSG Portfolio (OL 37)
Watkins, Colorado
- Capacity
- 1.5 MW
- Status
- Operating
- Fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Distributed Solar Development, LLC
- City
- Watkins
- County
- Adams County
- State
- Colorado
- Operational date
- December 2020
- Balancing authority
- SWPP
Oak Leaf - CSG Portfolio (OL 37) is a 1.5 MW solar power plant in Watkins, Colorado. Operated by Distributed Solar Development, LLC, it has been operating since 2020. The facility is located in Adams County, within the SWPP balancing authority.
Loading map…
Nearby solar plants in Colorado
Rocky Mountain Solar
Solar · Colorado · Operating · COD 2025
Neptune Energy Center Hybrid
Solar · Boone, Colorado · Operating · COD 2023
Fortress 1
Solar · Colorado · Under construction · exp. 2028
Thunder Wolf Energy Center Hybrid
Solar · Avondale, Colorado · Operating · COD 2023
Arroyo Solar
Solar · Avondale, Colorado · Under construction · exp. 2026
Source: U.S. Energy Information Administration (EIA-860M)