NSE Camber Solar PS6 LLC CSG
Platteville, Colorado
- Capacity
- 1.5 MW
- Status
- Operating
- Fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Nautilus Solar Solutions
- City
- Platteville
- County
- Weld County
- State
- Colorado
- Operational date
- February 2022
- Balancing authority
- WACM
NSE Camber Solar PS6 LLC CSG is a 1.5 MW solar power plant in Platteville, Colorado. Operated by Nautilus Solar Solutions, it has been operating since 2022. The facility is located in Weld County, within the WACM balancing authority.
Loading map…
Nearby solar plants in Colorado
Rocky Mountain Solar
Solar · Colorado · Operating · COD 2025
Neptune Energy Center Hybrid
Solar · Boone, Colorado · Operating · COD 2023
Fortress 1
Solar · Colorado · Under construction · exp. 2028
Thunder Wolf Energy Center Hybrid
Solar · Avondale, Colorado · Operating · COD 2023
Arroyo Solar
Solar · Avondale, Colorado · Under construction · exp. 2026
Source: U.S. Energy Information Administration (EIA-860M)