CO LI CSG 1 - Kamerra
Watkins, Colorado
- Capacity
- 1.5 MW
- Status
- Operating
- Fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Standard Solar
- City
- Watkins
- County
- Adams County
- State
- Colorado
- Operational date
- October 2019
- Balancing authority
- PSCO
CO LI CSG 1 - Kamerra is a 1.5 MW solar power plant in Watkins, Colorado. Operated by Standard Solar, it has been operating since 2019. The facility is located in Adams County, within the PSCO balancing authority.
Loading map…
Nearby solar plants in Colorado
Rocky Mountain Solar
Solar · Colorado · Operating · COD 2025
Neptune Energy Center Hybrid
Solar · Boone, Colorado · Operating · COD 2023
Fortress 1
Solar · Colorado · Under construction · exp. 2028
Thunder Wolf Energy Center Hybrid
Solar · Avondale, Colorado · Operating · COD 2023
Arroyo Solar
Solar · Avondale, Colorado · Under construction · exp. 2026
Source: U.S. Energy Information Administration (EIA-860M)