Mesa CSG 2 Massicotte
Palisade, Colorado
- Capacity
- 1.5 MW
- Status
- Operating
- Fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Standard Solar
- City
- Palisade
- County
- Mesa County
- State
- Colorado
- Operational date
- May 2019
- Balancing authority
- PSCO
Mesa CSG 2 Massicotte is a 1.5 MW solar power plant in Palisade, Colorado. Operated by Standard Solar, it has been operating since 2019. The facility is located in Mesa County, within the PSCO balancing authority.