Spanish Peaks Solar
Trinidad, Colorado
- Capacity
- 140 MW
- Status
- Operating
- Fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Spanish Peaks Solar LLC
- City
- Trinidad
- County
- Las Animas County
- State
- Colorado
- Operational date
- December 2024
- Balancing authority
- PSCO
Spanish Peaks Solar is a 140 MW solar power plant in Trinidad, Colorado. Operated by Spanish Peaks Solar LLC, it has been operating since 2024. The facility is located in Las Animas County, within the PSCO balancing authority.
Loading map…
Nearby solar plants in Colorado
Rocky Mountain Solar
Solar · Colorado · Operating · COD 2025
Neptune Energy Center Hybrid
Solar · Boone, Colorado · Operating · COD 2023
Fortress 1
Solar · Colorado · Under construction · exp. 2028
Thunder Wolf Energy Center Hybrid
Solar · Avondale, Colorado · Operating · COD 2023
Arroyo Solar
Solar · Avondale, Colorado · Under construction · exp. 2026
Source: U.S. Energy Information Administration (EIA-860M)