Sunnyside Ranch Community Solar Array
Carbondale, Colorado
- Capacity
- 1.5 MW
- Status
- Operating
- Fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Holy Cross Electric Assn, Inc
- City
- Carbondale
- County
- Garfield County
- State
- Colorado
- Operational date
- April 2015
- Balancing authority
- PSCO
Sunnyside Ranch Community Solar Array is a 1.5 MW solar power plant in Carbondale, Colorado. Operated by Holy Cross Electric Assn, Inc, it has been operating since 2015. The facility is located in Garfield County, within the PSCO balancing authority.
Loading map…
Nearby solar plants in Colorado
Rocky Mountain Solar
Solar · Colorado · Operating · COD 2025
Neptune Energy Center Hybrid
Solar · Boone, Colorado · Operating · COD 2023
Fortress 1
Solar · Colorado · Under construction · exp. 2028
Thunder Wolf Energy Center Hybrid
Solar · Avondale, Colorado · Operating · COD 2023
Arroyo Solar
Solar · Avondale, Colorado · Under construction · exp. 2026
Source: U.S. Energy Information Administration (EIA-860M)