Blythe Solar III, LLC Hybrid
Blythe, California
- Capacity
- 252 MW
- Status
- Operating
- Fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Blythe Solar III, LLC
- City
- Blythe
- County
- Riverside County
- State
- California
- Operational date
- May 2020
- Balancing authority
- CISO
Blythe Solar III, LLC Hybrid is a 252 MW solar power plant in Blythe, California. Operated by Blythe Solar III, LLC, it has been operating since 2020. The facility is located in Riverside County, within the CISO balancing authority.
Loading map…
Nearby solar plants in California
Bellefield Solar and Energy Storage Farm
Solar · Mojave, California · Operating · COD 2025
Bellefield 2 Solar & Energy Storage Farm
Solar · Mojave, California · Under construction · exp. 2026
Grace Energy Center
Solar · California · Under construction · exp. 2027
Lycan Solar Project
Solar · Unincorporated Rivers, California · Under construction · exp. 2027
Pelicans Jaw Hybrid Solar
Solar · Lost Hills, California · Under construction · exp. 2027
Source: U.S. Energy Information Administration (EIA-860M)