Blythe Solar III, LLC Hybrid
Blythe, California
- Capacity
- 252 MW
- Status
- Operating
- Fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Blythe Solar III, LLC
- City
- Blythe
- County
- Riverside County
- State
- California
- Operational date
- May 2020
- Balancing authority
- CISO
Blythe Solar III, LLC Hybrid is a 252 MW solar power plant in Blythe, California. Operated by Blythe Solar III, LLC, it has been operating since 2020. The facility is located in Riverside County, within the CISO balancing authority.
Loading map…
Nearby solar plants in California
Bellefield Solar and Energy Storage Farm
Solar · Mojave, California · Operating
Bellefield 2 Solar & Energy Storage Farm
Solar · Mojave, California · Under construction
Grace Energy Center
Solar · California · Under construction
Lycan Solar Project
Solar · Unincorporated Rivers, California · Under construction
Pelicans Jaw Hybrid Solar
Solar · Lost Hills, California · Under construction
Source: U.S. Energy Information Administration (EIA-860M)