Spirit Mound
Vermillion, South Dakota
- Capacity
- 135 MW
- Status
- Operating
- Fuel
- Petroleum
- Technology
- Petroleum Liquids
- Operator
- Basin Electric Power Coop
- City
- Vermillion
- County
- Clay County
- State
- South Dakota
- Operational date
- June 1978
- Balancing authority
- SWPP
Spirit Mound is a 135 MW petroleum power plant in Vermillion, South Dakota. Operated by Basin Electric Power Coop, it has been operating since 1978. The facility is located in Clay County, within the SWPP balancing authority.
Loading map…
Nearby petroleum plants in South Dakota
Watertown Power Plant
Petroleum · Watertown, South Dakota · Operating · COD 1978
Lake Preston
Petroleum · Lake Preston, South Dakota · Operating · COD 1978
Ft. Pierre
Petroleum · Fort Pierre, South Dakota · Operating · COD 2004
Highmore
Petroleum · Highmore, South Dakota · Retired
Valley Queen Cheese
Petroleum · Milbank, South Dakota · Operating · COD 2002
Source: U.S. Energy Information Administration (EIA-860M)