Swift 2
Cougar, Washington
- Capacity
- 72 MW
- Status
- Operating
- Fuel
- Hydroelectric
- Technology
- Conventional Hydroelectric
- Operator
- PacifiCorp
- City
- Cougar
- County
- Cowlitz County
- State
- Washington
- Operational date
- December 1958
- Balancing authority
- PACW
Swift 2 is a 72 MW hydroelectric power plant in Cougar, Washington. Operated by PacifiCorp, it has been operating since 1958. The facility is located in Cowlitz County, within the PACW balancing authority.
Loading map…
Nearby hydroelectric plants in Washington
Grand Coulee
Hydroelectric · Grand Coulee, Washington · Operating · COD 1941
Chief Joseph
Hydroelectric · Bridgeport, Washington · Operating · COD 1955
Wanapum
Hydroelectric · Beverly, Washington · Operating · COD 2011
Rocky Reach
Hydroelectric · Wenatchee, Washington · Operating · COD 1961
Boundary
Hydroelectric · Metaline, Washington · Operating · COD 1967
Source: U.S. Energy Information Administration (EIA-860M)