Priest Rapids
Mattawa, Washington
- Capacity
- 950 MW
- Status
- Operating
- Fuel
- Hydroelectric
- Technology
- Conventional Hydroelectric
- Operator
- PUD No 2 of Grant County - (WA)
- City
- Mattawa
- County
- Grant County
- State
- Washington
- Operational date
- October 1959
- Balancing authority
- BPAT
Priest Rapids is a 950 MW hydroelectric power plant in Mattawa, Washington. Operated by PUD No 2 of Grant County - (WA), it has been operating since 1959. The facility is located in Grant County, within the BPAT balancing authority.
Loading map…
Nearby hydroelectric plants in Washington
Grand Coulee
Hydroelectric · Grand Coulee, Washington · Operating
Chief Joseph
Hydroelectric · Bridgeport, Washington · Operating
Wanapum
Hydroelectric · Beverly, Washington · Operating
Rocky Reach
Hydroelectric · Wenatchee, Washington · Operating
Boundary
Hydroelectric · Metaline, Washington · Operating
Source: U.S. Energy Information Administration (EIA-860M)