Upper Baker
Concrete, Washington
- Capacity
- 105 MW
- Status
- Operating
- Fuel
- Hydroelectric
- Technology
- Conventional Hydroelectric
- Operator
- Puget Sound Energy Inc
- City
- Concrete
- County
- Whatcom County
- State
- Washington
- Operational date
- January 1959
- Balancing authority
- PSEI
Upper Baker is a 105 MW hydroelectric power plant in Concrete, Washington. Operated by Puget Sound Energy Inc, it has been operating since 1959. The facility is located in Whatcom County, within the PSEI balancing authority.
Loading map…
Nearby hydroelectric plants in Washington
Grand Coulee
Hydroelectric · Grand Coulee, Washington · Operating · COD 1941
Chief Joseph
Hydroelectric · Bridgeport, Washington · Operating · COD 1955
Wanapum
Hydroelectric · Beverly, Washington · Operating · COD 2011
Rocky Reach
Hydroelectric · Wenatchee, Washington · Operating · COD 1961
Boundary
Hydroelectric · Metaline, Washington · Operating · COD 1967
Source: U.S. Energy Information Administration (EIA-860M)