Lower Baker
Concrete, Washington
- Capacity
- 104 MW
- Status
- Operating
- Fuel
- Hydroelectric
- Technology
- Conventional Hydroelectric
- Operator
- Puget Sound Energy Inc
- City
- Concrete
- County
- Skagit County
- State
- Washington
- Operational date
- March 1960
- Balancing authority
- PSEI
Lower Baker is a 104 MW hydroelectric power plant in Concrete, Washington. Operated by Puget Sound Energy Inc, it has been operating since 1960. The facility is located in Skagit County, within the PSEI balancing authority.
Loading map…
Nearby hydroelectric plants in Washington
Grand Coulee
Hydroelectric · Grand Coulee, Washington · Operating · COD 1941
Chief Joseph
Hydroelectric · Bridgeport, Washington · Operating · COD 1955
Wanapum
Hydroelectric · Beverly, Washington · Operating · COD 2011
Rocky Reach
Hydroelectric · Wenatchee, Washington · Operating · COD 1961
Boundary
Hydroelectric · Metaline, Washington · Operating · COD 1967
Source: U.S. Energy Information Administration (EIA-860M)