Deer Creek (UT)
Heber, Utah
- Capacity
- 4.8 MW
- Status
- Operating
- Fuel
- Hydroelectric
- Technology
- Conventional Hydroelectric
- Operator
- U S Bureau of Reclamation
- City
- Heber
- County
- Wasatch County
- State
- Utah
- Operational date
- February 1958
- Balancing authority
- WAUW
Deer Creek (UT) is a 4.8 MW hydroelectric power plant in Heber, Utah. Operated by U S Bureau of Reclamation, it has been operating since 1958. The facility is located in Wasatch County, within the WAUW balancing authority.
Loading map…
Nearby hydroelectric plants in Utah
Intermountain Pumped Storage Project
Hydroelectric · Delta, Utah · Planned
Flaming Gorge
Hydroelectric · Dutch John, Utah · Operating
Cutler Hydro
Hydroelectric · Collinston, Utah · Operating
Jordanelle Dam Hydroelectric Project
Hydroelectric · Heber, Utah · Operating
Olmstead
Hydroelectric · Orem, Utah · Retired
Source: U.S. Energy Information Administration (EIA-860M)