Deer Creek (UT)
Heber, Utah
- Capacity
- 4.8 MW
- Status
- Operating
- Fuel
- Hydroelectric
- Technology
- Conventional Hydroelectric
- Operator
- U S Bureau of Reclamation
- City
- Heber
- County
- Wasatch County
- State
- Utah
- Operational date
- February 1958
- Balancing authority
- WAUW
Deer Creek (UT) is a 4.8 MW hydroelectric power plant in Heber, Utah. Operated by U S Bureau of Reclamation, it has been operating since 1958. The facility is located in Wasatch County, within the WAUW balancing authority.
Loading map…
Nearby hydroelectric plants in Utah
Intermountain Pumped Storage Project
Hydroelectric · Delta, Utah · Planned · exp. 2028
Flaming Gorge
Hydroelectric · Dutch John, Utah · Operating · COD 1963
Cutler Hydro
Hydroelectric · Collinston, Utah · Operating · COD 1927
Jordanelle Dam Hydroelectric Project
Hydroelectric · Heber, Utah · Operating · COD 2008
Olmstead
Hydroelectric · Orem, Utah · Retired
Source: U.S. Energy Information Administration (EIA-860M)